Future Trail Frequency of Use

Respondents were asked about the FREQUENCY OF FUTURE USE:

“If they existed, how often would you use these main multimodal trail connections?”

SCALE: 1 = Never or Rarely; 2 = Monthly; 3 = Weekly; 4 = Daily

Key things to note:

  • The results show that a dedicated 5% +/- would use trails daily; with between 10 and 35% using trails weekly, and then 20-35% using the trails connections monthly.
  • The Downtown connections, regional trail connections and the north-south connections appear to be the most favoured.

MORE INFORMATION​

For more information about the City of Smithville’s Parks and Recreation Master Plan Project, please contact:

Matt Denton, CPRP – Parks and Recreation Director
107 West Main Street
City of Smithville
Phone: (816) 532-8130
parksandrec@smithvillemo.org